Hongda mới

Dự án

Phosphate Rock Mining for INDORAMA ICS in Senegal

20m2 Horizontal Belt Filter for Phosphate Rock Mining

Project Overview

Quick Detail:

20m2 Horizontal Belt Filter for Phosphate Rock Mining

Project Overview:

Key Challenges:

  • First-time application of our belt filter in mineral processing
  • Required structural modificationand installation on existing steel framework
  • Extensive validation needed to meet client’s production capacity requirements

Our Solutions:

  • Conducted on-site surveys and filtration tests for technical reviews(Nov 2019 – Aug 2021)
  • Deployed on-siteengineers for installation supervision and commissioning
  • Achieved all performance targets (production capacity, cake moisture content, etc.)

Client Feedback:

Plans to gradually replace 3 older units at the site with our equipment, based on satisfactory operational results.

For more project details, feel free to contact us.

Share To:

Share on facebook
Share on twitter
Share on linkedin

tìm kiếm

Related Projects

300kt/a Phase 1&2&3 PA Project for Guizhou LuFa Industry Co., Ltd.
300kt/a Phase 1&2&3 PA Project for Guizhou LuFa Industry Co., Ltd.
Yunnan Evergreen Chemical Co
200kt/a MAP Project for Yunnan Evergreen Chemical Co., Ltd.
Qinghai Chuangxin Mining Development Co., Ltd.
50kt/a PA and 100kt/a Powdered MAP Project for Qinghai Chuangxin Mining Development Co., Ltd.
viVietnamese

Cảm ơn bạn cho tin nhắn của bạn!

Chúng tôi đã nhận được thông tin của bạn và sẽ liên hệ với bạn sớm.