Nickel and Cobalt Smelting Project for Lygend Mining in Indonesia

Φ32m、Φ36mCCD、Φ42m Thickener

Project Overview

Key Challenges:
• High seismic risk in Pacific Ring of Volcano location
• Pandemic-related construction constraints

Our Solutions:
• Innovative adoption of duplex stainless-steel material
• Replaced traditional carbon steel/rubber-brick lined tank design

Client Feedback:

NHD’s solution not only ensured equipment structural integrity but also significantly reduced civil construction timeframes. Particularly during the pandemic period, it provided robust technical support and equipment reliability that enabled the client to achieve Phase 1 production targets and subsequent over-production goals.

For more project details, feel free to contact us.

Share To:

Share on facebook
Share on twitter
Share on linkedin

tìm kiếm

Related Projects

300kt/a Phase 1&2&3 PA Project for Guizhou LuFa Industry Co., Ltd.
300kt/a Phase 1&2&3 PA Project for Guizhou LuFa Industry Co., Ltd.
Yunnan Evergreen Chemical Co
200kt/a MAP Project for Yunnan Evergreen Chemical Co., Ltd.
Qinghai Chuangxin Mining Development Co., Ltd.
50kt/a PA and 100kt/a Powdered MAP Project for Qinghai Chuangxin Mining Development Co., Ltd.
viVietnamese

Cảm ơn bạn cho tin nhắn của bạn!

Chúng tôi đã nhận được thông tin của bạn và sẽ liên hệ với bạn sớm.