300kt/a PA Project for INDORAMA ICS in Senegal

100m2 Rotary Table Vacuum Filter for 300kt/a PA

Project Overview

Key Challenges:

• Second overseas retrofit project involving complete filtration system (including pumps, piping, and separators)
• Required installation of larger equipment (replacing existing 77m² filter) to meet client’s capacity expansion needs
• First overseas self-installation project with strict quality supervision by French engineering inspectors

Our Solutions:
• Deployed multi-disciplinary team (process/technical/equipment engineers) for on-site assessment
• Developed innovative elevated installation solution
• Conducted targeted civil structure reinforcement
• Implemented two-shift work schedule with local workforce coordination

Client Feedback:

The 72-hour continuous operation test demonstrated outstanding performance:

  • Achieved a daily throughput of 562 tons, exceeding the required 558 tons/24h specification
  • Maintained gypsum water-soluble phosphorus content at 0.47, surpassing the 0.5 target requirement

For more project details, feel free to contact us.

Share To:

Share on facebook
Share on twitter
Share on linkedin

tìm kiếm

Related Projects

300kt/a Phase 1&2&3 PA Project for Guizhou LuFa Industry Co., Ltd.
300kt/a Phase 1&2&3 PA Project for Guizhou LuFa Industry Co., Ltd.
Yunnan Evergreen Chemical Co
200kt/a MAP Project for Yunnan Evergreen Chemical Co., Ltd.
Qinghai Chuangxin Mining Development Co., Ltd.
50kt/a PA and 100kt/a Powdered MAP Project for Qinghai Chuangxin Mining Development Co., Ltd.
viVietnamese

Cảm ơn bạn cho tin nhắn của bạn!

Chúng tôi đã nhận được thông tin của bạn và sẽ liên hệ với bạn sớm.