Project Scope:
Design and supply of Equipment of Modular Design for a heavy rare earth(Dysprosium & Terbium) pilot plant (100kt/a capacity)
Key Challenges:
- First-time modular system design in compliance with Australian standards (AS/NZS)
- The cooperatinginternational engineering company Worley Parsons only provided basic design specifications
- A tight delivery period of 5 months (June-November 2017)
Our Solutions:
- Standard Compliance
- Rapid translation of Australian mechanical, electrical, safety, and environmental standards
- Cross-departmental training on AS/NZS requirements
- Integrated Execution
- Cross-functional coordination among technical, procurement, and production teams
- Development of detailed engineering and manufacturing drawings
- Delivery Excellence
- Full equipment suite delivered by November 25, 2017
- Met all quality, technical, and scheduling requirements
Client Feedback:
Received formal commendation from Northern Minerals for standards-compliant design, seamless technical communication and on-time delivery.
For more project details, feel free to contact us.