New Hongda

Projets

Rare Earth Hydrometallurgy Project for Northern Minerals in Australia

Agitator, Thickener(CCD) and Flocculant Preparation System of Modular Design

Project Overview

Project Scope:

Design and supply of Equipment of Modular Design for a heavy rare earth(Dysprosium & Terbium) pilot plant (100kt/a capacity)

Key Challenges:

  • First-time modular system design in compliance with Australian standards (AS/NZS)
  • The cooperatinginternational engineering company Worley Parsons only provided basic design specifications
  • A tight delivery period of 5 months (June-November 2017)

Our Solutions:

  1. Standard Compliance
  • Rapid translation of Australian mechanical, electrical, safety, and environmental standards
  • Cross-departmental training on AS/NZS requirements
  1. Integrated Execution
  • Cross-functional coordination among technical, procurement, and production teams
  • Development of detailed engineering and manufacturing drawings
  1. Delivery Excellence
  • Full equipment suite delivered by November 25, 2017
  • Met all quality, technical, and scheduling requirements

Client Feedback:
Received formal commendation from Northern Minerals for standards-compliant design, seamless technical communication and on-time delivery.

For more project details, feel free to contact us.

Share To:

Partager sur facebook
Partager sur twitter
Partager sur linkedin

recherche

Projets connexes

300kt/a Phase 1&2&3 PA Project for Guizhou LuFa Industry Co., Ltd.
300kt/a Phase 1&2&3 PA Project for Guizhou LuFa Industry Co., Ltd.
Yunnan Evergreen Chemical Co
200kt/a MAP Project for Yunnan Evergreen Chemical Co., Ltd.
Qinghai Chuangxin Mining Development Co., Ltd.
50kt/a PA and 100kt/a Powdered MAP Project for Qinghai Chuangxin Mining Development Co., Ltd.
fr_FRFrench

Merci pour votre message!

Nous avons reçu vos informations et vous contacterons bientôt.