Key Challenges:
• High seismic risk in Pacific Ring of Volcano location
• Pandemic-related construction constraints
Our Solutions:
• Innovative adoption of duplex stainless-steel material
• Replaced traditional carbon steel/rubber-brick lined tank design
Client Feedback:
NHD’s solution not only ensured equipment structural integrity but also significantly reduced civil construction timeframes. Particularly during the pandemic period, it provided robust technical support and equipment reliability that enabled the client to achieve Phase 1 production targets and subsequent over-production goals.
For more project details, feel free to contact us.