100KT/a Copper Smelting Project for South Urals Gold Mine in Russia

In early 2017, NHD dispatched a professional team to Russia to complete the installation of agitator, reactors, and a Φ30m thickener for the client. The scope included on-site welding/assembly of tank structures and integrated installation of the thickener system.
Alumina Project for VANC in Vietnam

Following our participation in the Lam Dong alumina project constructed by CHALIECO for Vietnam’s Vinacomi Group, NHD has once again successfully provided a pan filter for the 650kt/a alumina project of Nhan Co. For more project details, feel free to contact us.
Cobalt Nickel Smelting Project for MCC Ramu in Papua New Guinea

This project represents the world’s first laterite nickel ore operation to achieve rapid construction and successful commissioning, reaching full production capacity in 2017. During later phases, NHD modified multiple equipment from international suppliers, making significant contributions to accelerating the client’s production ramp-up. Through this project, NHD accumulated substantial engineering design and application experiences, further consolidating our industry […]
300kt/a PA Project for INDORAMA ICS in Senegal

Key Challenges: • Second overseas retrofit project involving complete filtration system (including pumps, piping, and separators) • Required installation of larger equipment (replacing existing 77m² filter) to meet client’s capacity expansion needs • First overseas self-installation project with strict quality supervision by French engineering inspectors Our Solutions: • Deployed multi-disciplinary team (process/technical/equipment engineers) for on-site assessment […]
Phosphate Rock Mining for INDORAMA ICS in Senegal

Quick Detail: 20m2 Horizontal Belt Filter for Phosphate Rock Mining Project Overview: Key Challenges: First-time application of our belt filter in mineral processing Required structural modificationand installation on existing steel framework Extensive validation needed to meet client’s production capacity requirements Our Solutions: Conducted on-site surveys and filtration tests for technical reviews(Nov 2019 – Aug 2021) Deployed […]
Rare Earth Hydrometallurgy Project for Northern Minerals in Australia

Agitator, Thickener(CCD) and Flocculant Preparation System of Modular Design