المشاريع

100KT/a Copper Smelting Project for South Urals Gold Mine in Russia

Φ30m Leaching Thickener and Stirring Device for Leaching Reactor

Project Overview

In early 2017, NHD dispatched a professional team to Russia to complete the installation of agitator, reactors, and a Φ30m thickener for the client. The scope included on-site welding/assembly of tank structures and integrated installation of the thickener system.

شارك إلى:

مشاركة على facebook
مشاركة على twitter
مشاركة على linkedin

يبحث

مشاريع ذات صلة

300kt/a Phase 1&2&3 PA Project for Guizhou LuFa Industry Co., Ltd.
300kt/a Phase 1&2&3 PA Project for Guizhou LuFa Industry Co., Ltd.
Yunnan Evergreen Chemical Co
200kt/a MAP Project for Yunnan Evergreen Chemical Co., Ltd.
Qinghai Chuangxin Mining Development Co., Ltd.
50kt/a PA and 100kt/a Powdered MAP Project for Qinghai Chuangxin Mining Development Co., Ltd.
arArabic

شكرا لك على رسالتك!

لقد تلقينا معلوماتك وسوف نتصل بك قريبًا.